Compact plants and wastewater treatment retrofits
How prefabrication, equipment integration, and retained infrastructure can simplify a treatment plant.
Read articleCompact installation for a temporary shelter
Compact treatment installation in Repelón, Atlántico, associated with a temporary shelter during flooding in the south of the department.

Flooding in southern Atlántico created a need for sanitary infrastructure at a temporary shelter in Repelón. This field photograph records a compact treatment installation associated with that response.
The project served a temporary shelter in Repelón during flooding linked to the Magdalena River. The field photograph shows compact cylindrical treatment units installed at the site.
The case illustrates how wastewater infrastructure can respond to a specific site and its operating needs. Equipment, access and maintenance have to suit the scale of the installation.
The project served the context of a temporary shelter.
The photograph shows grouped treatment units in a limited area.
Treatment equipment was installed for the setting.
How prefabrication, equipment integration, and retained infrastructure can simplify a treatment plant.
Read articleWater source and contaminants, biological treatment, separation, and the final destination.
Read articleFlow, loads, target quality, process train, validation, and operating conditions.
Read articleTell us what wastewater you need to treat, what infrastructure you already have and how the plant needs to operate.
Optional analytics
May we collect aggregate usage statistics to improve this website? We do not share contact inquiry details. Declining does not affect the site.