All articles

Discharge and water-reuse requirements

Do you want to discharge treated water or put it to another use? These are different objectives, and their requirements belong at the beginning of the project.

Discharge and reuse are different objectives

Resolution 631 of 2015 establishes parameters and maximum limits for point discharges to surface water and public sewers, organized by discharge type and activity. The applicable article depends on the source and receiver; there is no single table for every project.

Resolution 1256 of 2021 regulates wastewater use. For the uses it covers, the resolution requires consideration of risks, responsibilities, control points, and monitoring; agricultural and industrial reuse have specific conditions.

What must enter the design basis

The engineering team must identify the competent authority, receiver or user, generating activity, flow, characterization, limits, monitoring frequency, and contingencies. That basis informs unit selection and sampling points.

Compliance is confirmed under actual conditions through commissioning, representative sampling, and traceable results. During design, the applicable regulation becomes a criterion for selecting processes, control points, and verification.

  • Discharge: receiver, activity, permit, and applicable limits.
  • Reuse: user, application, risks, quality, and control.
  • Operation: measurement points, frequency, responsibilities, and contingencies.
  • Verification: method, laboratory, date, unit, and sampling condition.

United States and European Union: references, not Colombian rules

In the United States, NPDES regulates point-source discharges under the Clean Water Act through permits with technology-based and, where needed, water-quality-based limits. In the European Union, recast Directive (EU) 2024/3019 governs urban wastewater and includes treatment, energy, public-health, and circular-economy objectives.

These frameworks support comparison and learning, but they do not replace Colombian law or the administrative decision applicable to a project in Colombia.

Related reading and regulations

  1. Colombia Ministry of Environment — Resolution 631 of 2015
  2. Colombia Ministry of Environment — Resolution 1256 of 2021
  3. US EPA — NPDES program
  4. EUR-Lex — Directive (EU) 2024/3019 on urban wastewater

Related solutions

Water recovery and reuse

We assess alternatives based on the water source, its intended use, and the quality required for that destination.

Explore the solution

Wastewater treatment

Wastewater treatment engineering from characterization and design through construction, commissioning, and operation.

Explore the solution

Related projects

CAMINO Nazareth — Institutional plant modernization

At CAMINO Nazareth in Barranquilla, Vandens modernized an institutional wastewater plant with a 21 m³/day design capacity by reusing tanks and renewing biological stages, pumping, aeration and controls.

View project

Recamier — Industrial wastewater treatment design

For cosmetics-manufacturing wastewater in Cali, Vandens designed a scalable industrial solution with 42–86 m³/day phased capacity, combining DAF, two MBBR stages, MC clarification and polishing.

View project

What water do you have, and what do you need to achieve?

We can review the source, destination, and available information to identify the next step.

Request a Quote