ExxonMobil — Domestic wastewater retrofit at an industrial facility

Conversion of an existing concrete structure into a 10 m³/day domestic wastewater treatment plant with equalization, two biological reactors, clarification and upgraded operating equipment.

Walkway above the retrofitted plant

A facility previously relying on a partitioned septic tank was converted into a multi-stage treatment system. The project reused the civil structure and added biological processing, pumps, blowers and operational controls to treat domestic wastewater generated on site.

Reported capacity
10 m³/day
Capacity communicated for the domestic wastewater project.
Biological treatment
2 reactors
Two reactor stages within the treatment train.
Integrated upgrade
Civil + equipment
Construction changes, pumps, aeration, piping, electrical work and controls.

From septic tank to a staged process

The installation had a compartmented concrete tank that required periodic Vactor truck removal. Civil works reconfigured the structure for initial separation and equalization.

The retrofit connected existing infrastructure to a more complete treatment sequence rather than rebuilding the entire facility.

Biology, clarification and storage

Two biological reactors were added ahead of secondary clarification and treated-water storage. The field photographs show construction stages and the arranged structures.

The project was described with a 10 m³/day domestic wastewater capacity.

Pumping, aeration and controls

Blowers, pumps, hydraulic networks, pipework, electrical work and control panels formed part of the upgrade. These supporting systems connect the tanks into an operable process rather than isolated treatment units.

Engineering details

Existing concrete structure

The original tank was adapted to support the new process arrangement.

Two biological stages

Two biological treatment reactors were incorporated.

Secondary clarification

Solids separation follows the biological stages.

Aeration and controls

The work included mechanical, electrical and process support systems.

See the solution

Construction work inside the concrete tank
Construction work inside the concrete tank
Concrete tank detail during the retrofit
Concrete tank detail during the retrofit
Civil works adapting the existing tank
Civil works adapting the existing tank
Interior compartments in the concrete tank
Interior compartments in the concrete tank
Modernized plant with yellow walkways and tanks
Modernized plant with yellow walkways and tanks

Keep exploring

Three fundamentals of wastewater treatment

Water source and contaminants, biological treatment, separation, and the final destination.

Read article

Compact plants and wastewater treatment retrofits

How prefabrication, equipment integration, and retained infrastructure can simplify a treatment plant.

Read article

Understanding MBBR and biofilm carriers

From river stones to treatment reactors: how communities of microorganisms help clean water.

Read article

Working on a similar challenge?

Tell us what wastewater you need to treat, what infrastructure you already have and how the plant needs to operate.