Plant assembly and access
A view of the reactors, pipework and maintenance access.
Engineering and O&M documentation
For Hidroituango ZIOP, Vandens developed engineering for a domestic wastewater plant with a 22 m³/day design capacity, two MBBR stages, MC clarification, tertiary filtration and separate water, air and sludge routes.

At infrastructure sites such as Hidroituango, operators need a wastewater plant they can understand: where water moves, which equipment supplies air, where solids separate and how each unit can be serviced. The ZIOP engineering organizes these needs into a compact domestic wastewater plant with a 22 m³/day design capacity.
The ZIOP plant is designed for domestic wastewater generated by personnel at the facility. Its treatment train includes initial solids separation, two primary tanks and equalization before biological treatment. Each operation prepares the water and protects the equipment downstream.
In a compact installation, arranging the tanks and their connections matters as much as selecting the process. The layout must make water flow understandable and leave access to pumps, valves and treatment equipment.
After equalization, the design sends wastewater through two moving-bed biofilm reactors (MBBR). Aeration delivers oxygen for microorganisms that break down biodegradable organic matter and keeps the carriers moving. MC clarification then separates solids and biological material.
Clarified water moves through storage and tertiary filtration before its intended outlet. Removed solids follow a separate line to sludge storage. The units work as a connected treatment train rather than individual pieces of equipment, with coordinated paths for water, air and solids.
The engineering package includes diagrams for water, sludge and antifoam routes, a separate air-distribution drawing and a piping-and-instrumentation diagram (P&ID). These help technicians understand which pumps and valves serve each stage and how supporting services connect to treatment.
Design calculations and operation-and-maintenance instructions complement the equipment layout with criteria for inspection and process care. The outcome of this engineering work is a treatment design that is dimensioned for its water and arranged for people to operate and maintain.

Process drawings show how tanks, pumps, blowers, valves and instruments connect to support treatment and maintenance.
Select a sheet, zoom, and move through it without leaving the page. Each view keeps a link to the complete PDF.
Use the buttons or the +, − and 0 keys. Drag or swipe to move across the drawing.
Four moments from the ZIOP plant show its scale, aeration and the carriers that support biological treatment.
A view of the reactors, pipework and maintenance access.
The surface shows the air transfer that keeps the biology active.
Flow enters the tank and mixes before continuing through the treatment train.
Carriers move with the air and provide surface for biofilm growth.
Initial separation protects and stabilizes feed to the biological process.
Aerobic biology is distributed across two reactors with a dedicated air network.
MC separation connects to an independent sludge-storage route.
Clarified water passes through storage and polishing before discharge.



Water source and contaminants, biological treatment, separation, and the final destination.
Read articleAerobic and anoxic conditions, basic chemistry, eutrophication, and design context.